Projects

A selection of projects showcasing the results we deliver.

Emergency Rail Drainage Response North Yorkshire

Our rail division delivered a rapid-response drainage solution for Network Rail, mobilising within 24 hours to access a remote site, clear a culvert blockage, and restore drainage with minimal disruption.

Storm Tank Clean – York Sewage Pumping Station

Our Utilities & Industrial team completed a two-week clean-up at a Sewage Pumping Station, removing 1,500 tonnes of sludge and rainwater from storm tanks.

CleverScan manhole survey

Trackside Remote Chamber Survey Using CleverScan

Due to the safety risks associated with the railway environment, access to the chamber was strictly prohibited for man-entry.

Rediscovery of Lost Nuclear Bunker Beneath Scarborough Castle

Our survey and inspection teams recently assisted in the rediscovery and assessment of a hidden Cold War nuclear bunker beneath the grounds of Scarborough Castle.

Sludge Transfer Under Challenging Site Conditions

Unstable ground conditions and restricted access meant direct loading by artic vehicles was not possible, requiring an adapted approach to ensure safe and efficient operations.

‘Complex’ recovery after chemical spill on A1 motorway

A tanker carrying calcium hydroxide crashed on the A1 in Yorkshire, causing a spill that required urgent clean-up.

Caldervale WWTW Culvert Cleansing

Cleanse and survey a number of 1300mm lines used for discharging after some land subsidence

Smart Motorways Alliance

Our client was working to a restricted timeframe for delivery of a DDMS scheme

Power Plant Tank Cleaning

Industrial Teams worked to remove sludge from a 8m deep waste water tank at a Power Plant in Grimsby